Site Reports logoSite Reports
All industriesConstruction handover

Practical completion lists that contractors can action

Walk the build, log defects by room, and share a dated pack with builders and certifiers. Building inspection PDF export covers most handover workflows today.

Report types

Field capture and team workflows are ready now. Specialized report types appear in the catalog for planning; PDF layouts for those types are still in development. Building inspection PDF export covers most handover and evidence packs today.

Use cases

Where teams use Site Reports

Typical jobs in this sector and the workflows that support them.

Defect lists tied to drawings

Place findings on uploaded plans so subcontractors know which tenancy or level needs attention.

Key workflow: Plan-linked findings

Photo evidence for retention releases

Photographic records support progress claims and retention discussions without separate gallery apps.

Key workflow: Linked evidence

Handover PDF for all parties

Export Building inspection PDFs with findings and recommendations suitable for practical completion meetings.

Key workflow: Building inspection PDF

The outcome

Reduce punch-list disputes with a single shared record from final walk to sign-off.

Related features

Workflow

From site walk to signed-off report

Three steps inspectors finish on site before they leave the property.

  1. 1

    Zones and rooms

    Define rooms and areas on site or from a plan so every finding has a clear location.

  2. 2

    Photos and notes

    Attach photos, severity, and narrative notes per finding while you walk the property.

  3. 3

    PDF export

    Compile captured evidence into a structured PDF report for clients and stakeholders.

FAQ

Construction handover questions

Common questions about capture, PDF export, and team workflows.

Is this only for residential handover?
The workflow suits residential and commercial practical completion. Large sites may split projects by level or stage.
Which PDF should we export?
Building inspection PDF export is the shipped layout for handover packs today.
Can builders respond in the app?
Collaborators with org access can update task status and add notes. External contractors receive PDFs or emailed summaries.
Do we need survey modules at handover?
Often no. Floor level surveys are available in the same project when tolerance evidence is required.

Start capturing in construction handover

Free tier available. No credit card required.